Welcome to the official website of Heka Smart Technology!
NEWS CATEGORIES
Next, the Kunshan monitoring installation editor will tell us about the wiring standard of the electronic lock of the attendance device to the controller. The electronic lock of the monthly attendance device has a relatively large working current, so there will be a certain distance between the electromagnetic lock and the controller, and if the current is too large, the battery will sometimes work, but it will block. . Then we are settling, the wire from the electronic lock to the controller is the wire. If the length of the wire is less than 50 meters, you need to add an extra power cable, so that the effect of parallel power supply can be generated, and if the site is greater than 100 meters, then we Move the controller as close to the electronics as possible to shorten the wiring distance.
Contact: Mr. Chen
contact number:15335257259
address:Room 1401, AVIC International Building, No. 579, Qianjin East Road, Kunshan City, Jiangsu Province
Landline:0512-50327055
Business QQ: 204875389
Mail:czw594147103@126.com